Wednesday, February 23, 2011

One week to go!!!

One week until the house is supposed to be done and we can have our walk through. Still seems like a lot of stuff to do, but it's cool to see all our design options come to life!!

The house still needs paint.
From Agave
But we have airconditioners.
From Agave

And they did the forms for the concrete decking around the pool and in the backyard.
From Agave

From Agave

We have cabinets and countertops!
From Agave

From Agave

From Agave

And we have light fixtures in the dining room and nook.
From Agave

And there's tile! All the grey tile in the entry, kitchen, hall is done, grout and all. The tile in the bathrooms and laundry room still needs grout.

Laundry room.
From Agave

Master bathroom.
From Agave

And we don't remember if we picked this tile for the front powder room, but it looks really nice!
From Agave

And this is the first time we saw the square sinks we picked out. We just liked the thought without even seeing a picture, but in real life they look pretty cool!

Master bathroom.
From Agave

Jack n Jill bathroom.
From Agave

Guest bathroom.
From Agave


1 week and counting... And last, a view of the house from the step in the pool until we do the walk thru and see the final product!!!

From Agave

Tuesday, February 15, 2011

Update on Ryleigh's Sickness

We went to the doctor on Friday afternoon. Her pink eye was getting better. But she now has an ear infection. And her barky croup breathing got better, but she had some wheezing in her lungs. They gave her a breathing treatment which alleviated the wheezing (which is good, b/c if it didn't it could have been early pneumonia). So she also has bronchiolitis requiring a week of breathing treatments - AGAIN! So she got steroids and albuterol for the bronchioltis, and an antibiotic for the ear infection, plus ear drops, plus eye drops to finish treatment of the pink eye, and motrin for the fever/pain... the kid was like a walking medicine cabinet!

She's finally starting to feel a little better. She still doesn't have her energy back. She still has the croup cough, especially at night. She's still clinging to her blanket, which she's never done before. So slowly we're seeing progress. Go back on Friday for a follow-up. We'll see what they say.

Thursday, February 10, 2011

More sickness, and 3 more weeks

On Sunday, we ran some errands and Ryleigh was fine. She went down for her nap and we woke her up after an hour or so. We notices she had a slight cough, which is how her last 2 episodes of RSV have shown up. We went to my co-worker's Super Bowl party and noticed Ryleigh was just in a funk. Not her usual self. Even when she's in a new place, she warms up eventually, but not this time. We stopped by my parents house and she STILL didn't get out of her funk, which was a shocker since she LOVES Grampa's house!! We got home and gave her a breathing treatment just in case it is RSV again. She also had a fever and almost fell asleep sitting up doing the treatment - not at all like she's acted when sick before. Made her a doctor appointment for Monday afternoon. Come to find out, she didn't have RSV... she has Croup and Pink Eye!! UGH! She got a shot of steroids to help with the Croup. Tuesday, she stayed home with Gramma and Grampa. She woke up from her nap crying for Mommy... totally NOT Ryleigh. Wednesday Chris stayed home with her and she was tired and clingy too. Today she took a 4 hour nap and she woke up much better. She's had rapid breathing using her accessory muscles to breath. Every time she coughs she'd whine and complain that her tummy hurts... not sickly pain, but achy pain. Her muscles hurt from breathing. And every night she's been waking up crying multiple times a night wanting cuddles. Ryleigh is not a cuddler. She's got another dr. appt tomorrow to make sure she's not getting worse (since she's still not really getting better). I have to say Croup is WAY worse than RSV!!

On another note - our house is 3 weeks from being finished!! Chris went out today to see the progress since he had to stay home with Ryleigh again today.

They're getting ready to put up the brick fences. And dug the trenches and laid the electrical for the pool.
From Agave

The pool got ReBar.
From Agave

And the plumbing is done too.
From Agave

We have a front door.
From Agave

And a stair rail. And texture on the walls.
From Agave

Shelves in the pantry.
From Agave

And in the closets.
From Agave

A Master bath tub.
From Agave

And interior doors, including closet doors.
From Agave

Very impressed with everything they've done in just a few days. It definitely is looking like a house now!

Thursday, February 3, 2011

From studs to house?

Our month of being at studs is officially over!! We have WALLS now!! On Monday, they finished the drywall.
Great Room
From Agave
Kitchen/Nook
From Agave
Pantry - this was Chris's easy access to the Master bedroom. He can't go through the walls anymore :)
From Agave
Stairway/Hallway
From Agave

And today when I drove by...
STUCCO!!!
That's not the actual color - it's still VERY wet! I got there just as the workers were finishing up.
From Agave

From Agave

From Agave

And walls ready for texture and then PAINT!!
From Agave

From Agave
It actually is looking like a house now!!

Sunday, January 30, 2011

House Update

Guess it's time for a house update now that it finally looks different.

This is the post tension system. It is part of the foundation. We didn't get a photo of ours as it was done while we were out of town. This our neighbor's post tension system. They have the same model and same layout as ours.
From Agave

We have solar panels and windows:
From Agave

From Agave

And shingles (waiting to be put on)
From Agave

And the whole house has styrofoam and chicken wire and is ready for stucco.
From Agave

And at the end of last week they dug our pool!!
From Agave

From Agave

From Agave

They also did the spray foam insulation this past week.
From Agave

And on Saturday they were putting up the drywall. This is the great room.
From Agave

And a bedroom.
From Agave

The loft.
From Agave

Looking downstairs.
From Agave

Starting to look like a real house!! We got our final walk thru date - March 3. And our close date is scheduled for March 8!! Now we can start the countdown!!

The ABC's according to Ryleigh

We were driving home tonight and Ryleigh was singing the ABCs. This is how it went:

"A-B-C-D-E-F-G
H-I-J-K-lmno-P
Q-R-S
T-U-V
W-X-Y-Z
Now I know my ABC
H-I-J-K-lmno-P (she replaces "next time won't you sing with me")
Q-R-S
T-U-V
W-X-Y-Z
Now I know my ABC
H-I-J-K-lmno-P
Q-R-S
T-U-V
W-X-Y-Z
Now I know my ABC...."

It was the never ending ABC's. We kept wondering why she'd never get back to A. Tonight we figured it out!! Crazy kid!!

Thursday, December 30, 2010

House Update

Here's how our house is coming along...

Just cause I was so impressed how quickly we went from dirt to foundation, I was curious how far they'd get in 1 day. (OK really, I needed to do some last minute Christmas shopping out by the house, so why not drive by?). This is where we saw it around 2pm on 12/22:
From Agave

And here's what I found when I drove up around 9-10am on 12/23:
From Agave

Looks like more was done right. To me it looked like they were getting prepared to do the 2nd story, but I didn't get my hopes up too high.
Chris drove out there to check out out the progress on 12/23 too, but around 5-6pm. Here's what he found:

From Agave

From Agave

They did almost the entire 2nd story!!!!
We went back out on Christmas Eve just to peak our curiosity.
This is the back.
From Agave

From Agave

It really looks like a house now!
From Agave

From Agave

We walked through it. We had asked the sales lady if our model had raised ceilings in the den due to our elevation. She told us we didn't... but we found evidence stating otherwise.
From Agave

From Agave

Those two are photos of the windows in the den. They both have header windows above the main window. The model doesn't have these. You can tell the ceilings are higher.

We can finally see how big the window is in the master bedroom.
From Agave


We went out yesterday (12/29) to shop again by the house. So we drove by to check on the progress even though it was pouring rain. There is always some crew or another working away on the house, even right up until it's totally dark outside. So at least we knew in the rain they wouldn't be working on our house. Chris caught these photos on his camera phone (so excuse the blurriness).
Here's the kitchen island framed out.
From Agave

And the upstairs loft window, see the view we have from the back of the house.
From Agave

And some clarification for us. We were told the stairway would be a pony wall, but when we saw the initial framing, the wall was really funky. Looked nothing like a pony wall to us. So we were glad to see this:
From Agave


Today, 12/30 I drove by again and saw them working on installing duct work for heating and cooling (yes even in the on again off again rain). There is black water proofing paper up on the roof getting soaked. But it looks like we should have progress on getting ready to prep for the roof. We found a few other houses that are around our stage as well and it looks like if we don't get a roof next, we may be getting ready for windows soon.

Very exciting to think that in 60 days or less we'll have our new house!!!